The last inspection where the builder is obliged to fix things at their cost, and in Mickleham it still turns up structure as well as finishes.
Ceiling structure damage, roof sheet damage and unsealed roof penetrations have all come out of Mickleham handovers. This is not only a paint and caulking exercise.

Annotated findings from Pre-handover (PCI) inspections on Mickleham builds. Client addresses withheld.




1Bored piersAfter boring and steel placement, before any concrete
2Slab pre-pourThe day before the pour, while pods, steel and formwork are open
3FrameOnce the frame and trusses are up and the roof is on, before sarking and cladding
4Lock-up (pre-plaster)After roof, cladding and external doors, before the plasterer
5FixingOnce mouldings, doors and joinery are in and before painting
6WaterproofingAfter the membrane is applied and before the tiler startsInstant online pricing, or talk to the booking team on 1300 471 805.
Send it straight away. Your leverage is strongest before you sign at practical completion.
Generally, because each item is referenced to the tolerance or the contract.
Yes. We return and mark every original item off before you settle.
Energising circuits, pressure testing, commissioning heating and cooling, appliance and garage door safety testing, and anything concealed.
Two to three hours, longer for a double storey.
Your contract and selections, the Guide to Standards and Tolerances 2015, the NCC and ABCB Housing Provisions.