Roof, cladding and external doors are on and the plasterer is next. Everything that keeps weather out of the wall is visible for a few days only.
Torn sarking and cladding sitting too close to the ground are the two that come up repeatedly here, and both are straightforward while the wall is open.

Annotated findings from Lock-up (pre-plaster) inspections on Mickleham builds. Client addresses withheld.




1Bored piersAfter boring and steel placement, before any concrete
2Slab pre-pourThe day before the pour, while pods, steel and formwork are open
3FrameOnce the frame and trusses are up and the roof is on, before sarking and cladding
5FixingOnce mouldings, doors and joinery are in and before painting
6WaterproofingAfter the membrane is applied and before the tiler starts
7Pre-handover (PCI)About a week before your practical completion dateInstant online pricing, or talk to the booking team on 1300 471 805.
It is the second barrier. Sarking is the layer that catches anything the cladding lets through before it reaches structural timber.
A minimum gap between the bottom of the cladding and the ground, so water and termites cannot bridge straight into the wall.
After external doors are hung and before plaster arrives, often only a few days.
Yes, the same point in a Victorian build.
We do not test plumbing or electrical rough-in, which are certified by the trades.
Easily, which is why the timing is worth chasing.